RAT530 - TEKNOLOGI REKA BENTUK BANGUNAN BERKECEKAPAN TENAGA
(ENERGY EFFICIENT BUILDING DESIGN TECHNOLOGY)
[ 3 Unit ]
*** Sumber data : SMUP
📖 Sinopsis Kursus / Course Synopsis ▼
Pelajar didedahkan dengan elemen rekabentuk yang boleh mengurangkan penggunaan tenaga dalam bangunan untuk keselesaan penghuni. Strategi-strategi ini adalah secara pasif dan aktif yang berinovasi dan mempromosikan penggunaan tenaga keterbaharuan. Memperkenalkan kriteria “Green Building Index” di mana pelajar perlu memahami untuk diaplikasikan pada projek rekabentuk bangunan di Studio tahap 400
Expose students to the design elements that can reduce building energy consumption for occupants’ comfort. These strategies are passively and actively innovative and promote the use of renewable energy. Introduce the criteria of the Green Building Index, which students need to understand and apply to the design project in Studio level 400.
*** Sumber data : SPBPK
📋 Hasil Pembelajaran Kursus / Course Learning Outcomes (HPK / CLO) ▼
| HPK / CLO | Penerangan HPK / CLO Description | Kaedah Pengajaran / Teaching Method | Pemetaan / Mapping: PLO USM |
Pemetaan / Mapping: LT |
|---|---|---|---|---|
| CLO1 | Able to distinguish passive and active technology in building design for Malaysia to reduce energy consumption in buildings and achieve occupant comfort. | Kuliah | PLO1 | C4 |
| CLO2 | Merumuskan and menyokong keberkesanan teknologi kecekapan tenaga yang digunapakai pada masa kini | Kuliah dan lain F2F | PLO2 | C6 |
| CLO3 | Able to analyze Overall Thermal Transfer Value (OTTV) in design of building envelope to achieve energy efficiency. | Kuliah dan lain F2F | PLO6 | C4 |
| CLO4 | Able to compose passive and active technologies in building design to achieve high energy efficiency in accordance with green rating criteria | Kuliah dan lain F2F | PLO7 | C5 |
*** Sumber data : SPBPK
📊 Penilaian / Assessment ▼
| Komponen Penilaian / Assessment Component | Peratusan / Percentage |
|---|---|
| Kerja Kursus / Course Work | 60% |
| Peperiksaan Akhir (PA) / Exam Work | 40% |
*** Sumber data : SMUP